Project Summary:  10 New Dock Positions and 1 Grade Level Door at Tire Distribution Center
Date of Completion:  12/2018
Project Managers:  Mike Wozniak & Mike Blazaitis
Equipment Manufacturer: Rite-Hite®, CHI Overhead Doors, Manaras Operators

A tire distribution center renovated their building to include 10 new dock positions with sectional doors. In addition to the new docks, (1) grade level bay door was required.

Applied Handling provided and installed top-rated Rite-Hite® dock equipment and CHI Overhead Doors. Here is a list of the equipment provided:

 If you have a project that requires the installation of new loading docks and doors, please contact us at 1-800-837-8020 and ask to speak to a dock and door specialist. Applied Handling – The leader in loading dock, door and material handling solutions.