NAME OF PROJECT:   Custom Dock Application
INDUSTRY:  Food Shipping Warehouse
PROJECT CAPTAIN:  Todd Conklin
INSTALLATION:  Applied Handling Operations Team
EQUIPMENT MANUFACTURER:  Rite-Hite and Leum Engineering

In order to assist in the loading process, a food shipping warehouse needed a robust solution to bridge the gap between his building and trailers.
Traditional pit-type loading docks would not fit this application, due to the very low dock height and drainage issues. The resolution, “Top of Dock” levelers by Leum Engineering, and WG410 Shelters by Rite-Hite.

Key Services

Engineered Solutions

Construction

Product Application

Share This Article