Name of Project: Dock Shelter Replacement – Fraser, MI
Industry: Machining Manufacturer
Project Summary: Removal and Replacement of Dock Shelters
Building Square Footage: Approx. 100,000+
Project Captain: Mike Blazaitis
General Contractor: Applied Handling, Inc.
Equipment Manufacturer: Rite-Hite

A Machining Manufacturer in Fraser, MI had a problem with harsh weather conditions and off-centered trailers damaging their dock shelters. Applied Handling surveyed the dock area and proposed a replacement dock shelter that properly fit the application. By correctly sizing and centering the dock shelters, we were able to eliminate the damage caused by incoming trailers because the Rite-Hite Survivor’s flexible side frames withstand impact and maintain integrity under most conditions.

Sale and Installation of the following Products:

Key Services

Energy Savings

Engineered Solutions

Construction

Product Application

Share This Article